News Flash Home
The original item was published from 12/15/2021 3:24:25 PM to 12/16/2021 8:45:32 AM.

News Flash

Township News

Posted on: December 15, 2021

[ARCHIVED] Energy Transfer Work Scheduled Near Herman O West Drive

Energy Transfer has notified Uwchlan Township that work is scheduled to occur as early as December 16th to evaluate and potentially repair an anomaly discovered during a recent smart-tool run through their existing 8-inch Beckersville to Twin Oaks pipeline. The work location is within the Eagleview Community off of Herman O West Drive. The scope of work will include the installation of erosion and sedimentation controls, excavating and evaluating the existing pipeline at the anomaly location, and, if required, repairing the anomaly (which is anticipated to involve a new coating application). Work is anticipated to take 5 to 7 workdays. Permits have been obtained from PA DEP for this work. 

Facebook Twitter Email

Other News in Township News

NF Yard waste changes

Yard waste collection changes

Posted on: March 30, 2026 | Last Modified on: April 2, 2026
NF AQUA

AQUA works in Marchwood

Posted on: March 4, 2026
page announcing survey

Quality of Life Survey

Posted on: February 17, 2026
NF PECO works-1

PECO works in Uwchlan

Posted on: September 10, 2025