News Flash

Township News

Posted on: July 9, 2018

Sunoco Pipeline Update

Uwchlan Township officials met with Sunoco Representatives on Friday, July 6th to discuss the Mariner East 2 Project. Sunoco reported that notification has been made to the Pipeline and Hazardous Materials Safety Administration (PHMSA) on or about June 22, 2018 that they intend to use an existing 12” pipeline to transport Natural Gas Liquids (NGLs).  Sunoco completed a refurbishing of this 12-inch line in 2016 and the pipe is currently an active line being used by Sunoco to transport other petroleum products. Sunoco is required to provide PHSMA a 60-day notice that they intend start transporting NGLs in the existing 12” pipeline. The change over may begin as early as August 21, 2018 (end of the 60-day notification period).  Sunoco has provided the Pennsylvania Utility Commission (PUC) and PA Department of Environmental Protection (PA DEP)courtesy notification of this change over.


A map depicting the location of both pipelines can be found by Clicking Here.


For questions, please contact the Sunoco Non-Emergency Hotline at 1(855) 430-4491. 

Facebook Twitter Google Plus Email

Other News in Township News